Sched Options tab

The Sched Options tab includes additional scheduling options in which the available fields depend on if the Measure active job field is checked and whether or not a future schedule has been entered on the Schedule tab.
Figure 1. Sched Options tab
fig31

Refer to Panel 8 – Sched Options for details of the individual fields and edits.