Schedule tab
The Schedule tab is used to generate a schedule for repetitions of future measurements. A maximum of 105 future scheduled measurement entries is allowed.
Click the calendar button to select a date/time or enter the value
directly. Enter the Repeat and After fields, then click Add to Schedule
to add the date(s). The entry(s) are added to the Measurement Schedule.
Click the checkbox to select or unselect one or many entries or click
Select All to select all or Unselect All to deselect all the entries.
Figure 1. Schedule tab
Refer to Panel 7 – Schedule for details of the individual fields and edits.