Timeout considerations
The wait-time for a system-managed rebuild is expected to vary from a few seconds for a small structure to a few tens of seconds for a large structure. This means that transactions can be purged by DTIMOUT, or by an operator command, while waiting on the rebuild.
To minimize the risk of unnecessary problems caused by timeouts during syncpoint processing, the CICS wait exit for CFDT unit of work control functions specify that the wait is not purgeable.
Note: Making the wait for CFDT unit of work control functions non-purgeable
does not apply to CICS TS 1.3 regions connected to a later level of the CFDT
server that supports system-managed rebuild. In this case, if a transaction
makes any recoverable changes to a coupling facility data table before being
purged, it will probably go into a wait again during syncpoint processing.
If this happens, it should be left waiting until the rebuild completes, because
any further attempt to purge it could result in the UOW being shunted as having
failed during syncpoint. If the UOW is shunted in these circumstances, it
will require manual intervention to retry syncpoint processing and complete
the UOW when the structure becomes available again.