IBM WebSphere Business Modeler Advanced Version 6.0.2.1
Interim Fix 12 Readme
===================================================================================
© Copyright International Business Machines Corporation 2007. All rights reserved.
This is an interim fix for IBM® WebSphere Business Modeler® Advanced Version 6.0.2.1.
Installing the interim fix
Fixes included in this interim fix
Product notes
To install the interim fix, complete the following steps:
The interim fix is now installed.
This is a cumulative interim fix for WebSphere Business Modeler Advanced Version 6.0.2.1.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
20820,100,838 | JR28403 | Fixes a problem when performing a WebSphere Process Server export of a model containing nested conditions in decision expressions. |
38992,999,000 | JR28390 | Prevents report template corruption after inserting spaces at the end of a data field's XPATH expression. |
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
50623,6X8,760 | JR28175 | Eliminates an exception returned when performing auto-layout after adding a lane in swimlane layout. |
28748,999,000 | JR28251 | Corrects an XSD generation problem during export to WebSphere Process Server where an .xsd file is overwritten by a file with unrelated content. |
65070,033,000 | JR28275 | Allows for checkout of all project elements after a project has been checked in with a renamed default catalog. |
This interim fix includes the following fixes, which are associated with APAR JR28275:
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
50179,6X8,760 | JR27931 | Allows deletions from a repository by non-administrator users and users outside of the group that owns the repository. |
This interim fix includes the following fixes, which are associated with APAR JR27963:
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
87271,010,678 | JR27629 | Additional corrections for checkout failures when two users are updating or renaming a shared element, and a third user attempts to perform a checkout. |
87987,057,649 | JR27721 | Corrects a problem with the display of inputs and outputs on the Input and Output logic tabs in the Attributes view for a task when the number of inputs or outputs exceeds two. |
00867,228,631 | JR27755 | Ensures that the History view displays the correct number of revisions when integrated with Clearcase. |
29398,442,000 | JR27759 | Corrects an import problem where multiple elements are created in the Project tree for a single elment. |
08598,500,000 | JR27845 | Prevents validation failure during XML export and report generation. |
This interim fix includes the following fixes, which are associated with APAR JR27882:
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
00146,69C,760 | JR26905 | Guarantees the appropriate display of decision branch conditions for output branches when viewing conditions for multiple-choice decisions. |
29896,6X8,760 | JR27500 | Marks the Commit and Update items with a warning symbol in the project tree view context menu to indicate that these actions in this context are deprecated, and will be removed from this context menu in future versions. |
24687,442,000 | JR27514 | Corrects failure in deleting annotations. |
83859,999,000 | JR27539 | Corrects failure to import business services when names exceed WebSphere Business Modeler naming limit. |
50274,6X8,760 | JR27609 | Corrects an issue where copy and paste of stop nodes results in later misalignment of upstream connections, if the connection is moved from a from a pre-existing stop node to the pasted stop node. |
87271,010,678 | JR27629 | Corrects checkout failures when two users are updating or renaming a shared element, and a third user attempts to perform a checkout. |
50143,6X8,678 | JR27707 | Corrects a process diagram copy and paste failure when pasting a default start or stop node in swimlane layout. |
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
89120,442,000 | JR27273 | Enables the persistence of internal project data after a failure occurs. |
50199,6X8,760 | JR27532 | Corrects an issue where copy and paste of stop nodes results in later misalignment of upstream connections. |
22583,442,000 | JR27542 | Not a fix for the issue, however, code implemented to detect and assist in reporting if this swimlane corruption issue occurs. |
This interim fix includes the following fixes, which are associated with APAR JR27542.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
01973,758,758 | JR26851 | Ensures that new line characters are generated when specified in the content of the Description field for a Process procedure report template. |
89135,442,000 | JR27117 | Corrects issues with modeling artifacts built through the Expression Builder. |
86961,010,678 | JR27177 | Improves the message returned to users when a check out from CVS fails, including enhanced user feedback and recommended user actions. |
34544,724,724 | JR27249 | Allows the opening of processes containing elements with leading or trailing blanks in their name. |
30697,756,000 | JR27255 | Fixes a problem with repository labels being visible when the repositories in the diagram are hidden. |
76545,500,000 | JR27257 | Improves the performance of some basic diagram editing operations. |
91491,550,000 | JR27260 | Fixes incorrect behaviour in generated report templates where the font setting for a cell in the first row of a table is applied to all cells in the table. |
09894,442,000 | JR27316 | Enhances the Repair process action, allowing WebSphere Business Modeler to open process models that have errors and were previously unviewable. |
21728,442,000 | JR27371 | Fixes processing for corrupt data within a process model and allows the model to be published. |
This interim fix includes the following fix, which is associated with APAR JR27380.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
20414,033,000 | JR26659 | Prevents an out-of-memory error during analysis of input and output paths. |
27759,756,000 | JR26709 | Prevents the generation of an invalid error in the Check Paths for Stop Nodes confirmation dialog during the creation of simulation snapshots. |
00146,69C,760 | JR27118 | Corrects a problem where the output of a third branch in a decision cannot be viewed or modified in the Attributes view. |
61430,442,000 89201,442,000 |
JR27043 | Corrects failure in report generation when queries have nested collation. |
89176,442,000 | JR27055 | Prevents a null pointer exception that is surfaced to the user when attempting to perform CVS check-out while disconnected from CVS server. |
89146,442,000 | JR27132 | Fixes a problem where the product hangs when switching to swimlane view by roles. |
32219,019,866 | JR27144 | Corrects a problem in simulation validation that surfaces null pointer exceptions to the user. |
31625,019,866 | JR27145 | Alleviates model corruption preventing user from opening a process model. |
86412,010,678 | JR27146 | Corrects CVS committed elements from corruption due to rename actions. |
89146,442,000 | JR27161 | Improves performance and scalability during project publishing action. |
This interim fix includes the following fixes, all of which are associated with APAR JR27183.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
71849,033,000 | JR26324 | Corrects the display of gradient filled elements in a diagram that is embedded into a report exported to PDF. |
61430,442,000 49080,442,000 |
JR26345 | Avoids partial check-outs while performing the CVS team support check-out action, due to connection or other unknown failures on the client or server. |
55957,999,000 | JR26560 | Corrects the displacement of the cursor to the beginning of the field when the first character is typed in a date or time field of the Process editor's attributes view duration tab for an unspecified Processing time or Resource wait time. |
55958,999,000 | JR26567 | Corrects the behavior of collapsing sections of the Process editor's attributes view duration tab when focus is moved from element to element in the Process editor. |
27469,756,000 | JR26629 | Corrects the display behavior for decision percentage labels, when toggling the Grid or Page break overlay, after setting the preference to hide in the Visual attributes page. |
34118,724,724 | JR26640 | Eliminates an unexpected exception when exporting using WebSphere Business Monitor Development Toolkit. |
27679,756,000 | JR26651 | Corrects the reporting of negative numbers for durations over 24 days within Profile specification reports for Simulation profile analysis. |
01607,033,000 | JR26657 | Ensures that text that is vertically aligned in the Report template editor appears aligned in the generated report. |
55268,070,724 | JR26661 | Corrects WSDL generation when a Technical specification contains callbacks. |
65448,L6Q,000 | JR26700 | Provides a better end user message when an unexpected exception occurs when exporting using WebSphere process server export. |
12826,019,866 | JR26713 | Corrects problems with generation of Process level details or Task by role reports due to incorrect handling of certain characters (!@#$%^&*(){}[]'";`). |
28444,756,000 | JR26756 | Ensures persistence of Page layout data under migration for global elements that support page layout. |
00145,69C,760 | JR26869 | Eliminates configuration issues reported by error markers on WebSphere Business Modeler features in the Manage configuration view. |
75219,500,000 | JR26871 | Enhances the existing behavior for lock and unlock functionality while performing versioning actions for Clearcase. |
46886,499,000 | JR26886 | Corrects the calculation of simulation figures when a task has a duration of less than one second. |
This interim fix includes the following fixes, all of which are associated with APAR JR26940.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
25329,756,000 | JR26217 | Corrects problem with long save and import time when a cycle exists in a process model |
01582,033,000 | JR26325 | Corrects problem with truncation in the Process procedure reports column heading |
00002,I00,760 | JR26353 | Corrects a problem where an error message is incorrectly displayed after renaming an element with a single parenthesis when working in swimlane layout |
JR26377 | Allows manual ordering of elements in the project tree and allows user to save ordering | |
62755,442,000 | JR26392 | Adds user friendly messages for exceptions that are surfacing to the end user during and after import action failure. |
54509,L6Q,000 | JR26478 | Fixes problem with the Process procedure report when double quotes are used |
55269,070,724 | JR26570 | Improves error messages TEN06510E and TEN06520E by adding quotes to indicate replaceable strings |
64595,442,000 | JR26582 | Removes the copy action from the context menu in the project tree for predefined queuries |
This interim fix includes the following fixes, all of which are associated with APAR JR26643.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
41333,999,000 | JR26319 | Corrects process validation error when exporting for WPS. |
49208,442,000 | JR26347 | Adds ability to auto-layout and maintain swimlane order. |
This interim fix includes the following fixes, all of which are associated with APAR JR26381.
This interim fix includes the following fixes. The PMR number and APAR identifier associated with each fix are included.
PMR Number | Related APAR Identifier | Description |
65749,999,706 | JR25993 | Corrects failure to authenticate with a Publishing server when using long user ID and password combinations. |
55048,999,000 | JR26020 | Corrects the ability to create expressions using simple type objects imported through Business service object import. |
71850,033,000 | JR26054 | Enables scaling of SVG diagrams exported from the Process editor and embedded into a custom report. |
71812,033,000 | JR26092 | Prevents a maximum path exception from occuring while attempting to perform Input and output paths static analysis on a connector in a process diagram. |
04091,070,724 | JR26101 | Prevents a WebSphere process server export failure when attempting to reconcile duplicate inputs and outputs on import from a WSDL. |
24835,756,000 | JR26114 | Adds missing references to SVG shapes of Business services on export to Monitoring toolkit. |
25329,756,000 | JR26217 | Suppresses path cycle analysis to improve save and import times. |
This interim fix includes the following fixes, all of which are associated with APAR JR26169.
When testing the connection to a Crystal Reports server from the Preferences page, it might take several minutes for the connection test to complete.
When creating a new Crystal Reports report template using Detailed Process Data Source as the data source, you might experience a significant delay when selecting fields to display in the report template. On the Select Fields page of the Report template wizard, if you select all available fields using the >> button, it will take several minutes for the Fields to Display list to populate.
To avoid this delay, consider individually selecting fields that you want to display using the > button instead of selecting all the available fields at once using the >> button.
If you delete a Crystal Reports report template from the project tree while the report template is open in the Report Designer, the deletion will not complete. Even though the report template will not appear in the project tree, the associated files will not be deleted and you will not be able to create a new report template with the same name as the deleted report template.
To avoid this situation, close the Report Designer before deleting a Crystal Reports report template.
If you are experiencing a maximum path exception when performing Input and output paths static analysis on a connector in a process diagram, increase the value of maxEdgesAndPaths in the plugin.properties file contained in eclipse\plugins\com.ibm.btools.bom.analysis.statical. For larger processes, a good starting value is 160000. Note that it might take longer perform analysis on these larger processes.
If you are experiencing long wait times when saving or importing, it might be due to the number of path cycles in your models and the time required to validate these path cycles. To improve performance, you can disable cycle path analysis by modifying the value of isCycleDetectionEnabled to "false" in the plugin.properties files found in the eclipse\plugins\com.ibm.btools.mode.bpel and eclipse\plugins\com.ibm.btools.mode.fdl folders.
Note: The detection of path cycles may have caused a lenghty validation messages to be generated and persisted on models created prior to interim fix 3. If you have applied the fix and restarted, the tool only executes the message trimming the first time after restarting. So, if you did not set the value to "false" then the existing messages will remain, however, they will be trimmed to reflect the value of maxCyclesToReport in the plugin properties files. If you wish to have the tool perform this start up processing again, remove the lines containing isBpelCycleMessagesTrimmed and isFdlCycleMessagesTrimmed from workspace.properties in your workspace directory under .metadata\.plugins\com.ibm.btools.blm.migration.workspace. Also, be aware that once the validation messages are removed, the diagram would have to be modified in a way to trigger the re-validation of path cycles, if path cycle detection is re-enabled.
WebSphere Business Modeler now allows you to maintain swimlane order during auto-layout. The behavior is enabled through the ordering dialog, available through the context menu of an open process diagram. Previously, the OK button would only be enabled if you changed the order; now it is enabled when the state of the auto-layout button changes.
You can now manually sort items within the Project Tree view, for example, to reflect frequency of use or relative importance of items within a catalog.
By default, items in the Project Tree view are sorted alphabetically within a container or catalog. When this default mode is enabled, the sort button in the Project Tree toolbar is pressed.
To enable manual sorting, click the sort button in the Project Tree toolbar to deselect it. The default order of items will change to chronological ordering, with most recently created items appearing last in a given container. To change the order of items within a container, select the item and drag it to the desired position within that container.
To move an item to a different container, for example to move a business item from one data catalog to another data catalog, first drop the item onto the catalog or logical node where you want it to be. The item will appear last in the new container. Then drag and drop the item to the desired position within the container.
There is a fixed order for item types within a catalog. For example, within the Process catalog, processes always come before tasks. Even if the logical nodes are not visible, you cannot change the order of these item types. For example, within the process catalog, even if you cannot see the separate containers for processes and tasks, you will not be able to reorder a task before a process.
The sorting mode and order of items is maintained when the product is restarted, and when catalogs are imported and exported. However, the ordering of items is not maintained when using project versioning. A catalog that is checked in and out again will revert to default alphabetical ordering.
As an option in the Project Tree view, you can choose whether the navigation view selection is linked to the active editor. This means that when you are editing an item in an editor, that item is highlighted in the Project Tree. This is enabled by clicking the link-to-editor button in the Project Tree toolbar. Starting with this interim fix, the state of the link-to-editor button is maintained when you shut down and restart the product.
In a process diagram, you can now show or hide repository connections. To show or hide the connections, right-click the diagram and select Show > Repository Connections. This feature is particularly useful in the FileNet Business Process Management mode because of the recommended pattern of using repositories to pass data.
The alignment fix, provided through the fix for JR26657, requires that the user multi-select the text elements that should be vertically aligned, perform one of the align actions, for example, Align top via the toolbar button, and save the template.
The current fix is only available if elements are specified with Arial or Times New Roman fonts. Future updates to this component will give consideration to all supported fonts.
If you are checking out projects from a CVS repository and your environment is configured with pserver or extssh (ssh2 only), you can attempt to alleviate failing check-outs due to connection errors by increasing the Communication timeout preference. To increase the Communication timeout, navigate to Windows > Preferences > Team > CVS, and increase the value of Communication timeout.
If you are checking out projects from a CVS repository and your environment is configured with pserver or ext or extssh (ssh1 only), a complimentary fix which will be delivered as 6.0.2.1-WB-ModelerAdvModelerBas-IFJR26345, will surface additional parameters to allow user-defined timeout values.
As of this interim fix, before showing the lock/unlock dialog, the Clearcase repository is queried for the lock status of the element being locked or unlocked. Based on the results returned the following actions are taken:
In all cases the OK and Cancel buttons are enabled, however if neither of the radio buttons can be selected, clicking either the OK or Cancel button will effectively cancel the operation.
This support pack provides the FileNet Business Process Management mode and the FileNet Business Process Management export, both of which enable you to model processes that you can open with FileNet P8 Process Designer. For information on the SupportPac, refer to the BA77.pdf file included in the SupportPac ZIP file.
Note: If you are using the WebSphere Business Modeler FileNet Integration SupportPac released in June 2007, and you upgrade to Interim Fix 7 for WebSphere Business Modeler, you must upgrade to the refreshed WebSphere Business Modeler FileNet Integration SupportPac released in October 2007. You can identify the refreshed version of the SupportPac by looking at the edition notice on the PDF that accompanies the SupportPac download.
If you do not install this refreshed SupportPac after upgrading to Interim Fix 7, you will have problems exporting from WebSphere Business Modeler.
The fix for the problem where the product hangs when switching to swimlane view by roles, allows the user to open the swimlane layout of the diagram. The problem manifests when roles that no longer exist are being referenced. The swimlanes corresponding to the missing roles remain. Both the swimlane and the elements it contains are decorated with errors. To remove the swimlane, the user should perform an auto-layout.
With interim fix 8, the Commit and Update actions are marked as deprecated in the Project tree view context menu, and it is recommended that you not use them. They will be removed in the next release deliverable, WebSphere Business Modeler 6.1.0. Currently, the context menu items in the Project tree, Version > Commit/Update, will be marked with a warning symbol.The reasons for removing these actions are as follows:
When a user performs an XML export or generates a report, a model validation is performed as a precursor to the requested processing. Models are evaluated in sequence and invalid models are reported before any transformation errors occur.
You might experience problems when attempting multiple actions from the Project Tree if you do not commit the changes between actions. For example, if you rename a process and then attempt to create another process with the same name, the create will fail. However, if you rename a process, commit the change, and then create another process with the same name, it will succeed.
After performing an action from the Project Tree (in particular, deleting, renaming, or moving an element from one catalog to another), it is highly recommended that you synchronize and commit your change before proceeding to make additional changes to your project.
As a result of a rollback in interim fix 11 to fixes involving Project tree rename actions and Versioning, which is necessary to resolve a more serious scenario reported in PMR 65070,033,000, the following scenario is considered to be a known limitation with a valid workaround.
Abstract: Synchronize view after update reports renamed elements as conflicts.
Requirement: This scenario requires two users. The two user requirement can be simulated by opening two workspaces on the same Modeler installation
Expected: No content appears in the synchronize view
Actual: The renamed elements appear as conflicts in the synchronize view.
Workaround: In this specific scenario atleast two additional updates will be required before no content is reported in the Synchronize view. The requirement for the number of updates may vary if a derivative of this scenario is performed.
Unrelated to the rollback mentioned above, another rename scenario has been identified as a known limitation with a valid workaround. The following scenario exist before interim fix 11.
Abstract: Synchronize after check-out shows renamed catalog, and elements, as conflicts.
Expected: No content appears in the synchronize view
Actual: The renamed catalog and the process appear as conflicts in the synchronize view.
Workaround: Perform an "Update from repository" action from the Synchronize view, on these conflicting elements.