IBM® WebSphere® Business Modeler Basic Version 6.0
Interim Fix 3 Readme
===================================================================================
© Copyright International Business Machines Corporation. 2004, 2005. All rights reserved.
This is an interim fix for WebSphere Business Modeler Basic Version 6.0.
Installing the interim fix
Fixes included in this interim fix
To install the interim fix, complete the following steps:
The interim fix is now installed.
This is a cumulative interim fix for WebSphere Business Modeler Basic Version 6.0. In addition to the most recent fixes, it includes the fixes from all of the previous WebSphere Business Modeler Basic Version 6.0 interim fixes.
This interim fix includes the following fixes. The PMR and APAR numbers associated with each fix have been included.
PMR Number | Related APAR Identifier |
Description |
35896,300,624 | JR22943 | Enables display of broken references of organizations and classifiers in editors and views, allowing you to locate and correct broken references. |
JR23127 | Enables the generation of predefined reports for sample ABC project. | |
35896,300,624 | JR23185 | Improves error detection during migration allowing the migration to continue processing. |
07313,800,624 | JR23202 | Reduces the risk of out of memory errors during the generation of predefined process reports. |
This interim fix includes the following fixes. The PMR and APAR numbers associated with each fix have been included.
PMR Number | Related APAR Identifier |
Description |
06720,756,000 | JR23041 | Correct a problem for generating a report from the process editor for the customer process model. |
07980,999,000 | JR23071 | Correct display of elements in report diagram being filled with solid black after performing generate and export report from process editor. |
JR23110 | Further correction for line wrap of long strings in reports. |
This interim fix includes the following fixes, all of which are associated with APAR JR23013:
Correct refreshing of swimlane view after connecting a task to a repository in basic mode
Allow carriage returns and line wrap of long strings in reports
Correct truncation of data in reports
Show individual resources for resource templates
Remove error windows that appear when Modeler and Rational Software Architect perspectives are both open
Dislay broken references to deleted classifier values
Correct a problem with versioning after updating a model
Correct error when using business item instances for default values of a global repository
Correct problems with applying recurrence periods to intervals in a timetable
Straighten separator line in swimlane view
Correct a problem with renaming a project
Preserve project tree contents if a save operation is unsuccessful
Scenario 1
Circumvention: Rename the process and remove the ampersand.
Scenario 2
Circumvention: Fix the broken references via the attributes view or specification page. Beware of the caveats of Scenario 2 and Scenario 3.
Alternate Scenario 2Perform Scenario 2 but instead of exporting/importing the process, delete the classifier value to create a broken reference on the process.
Scenario 3
Circumvention: Restart modeler and perform the delete action. Note, the import action may also fail, as described in the results, if the import includes the same process which was imported in step 1.
Alternate Scenario 3Perform Scenario 3 but instead of exporting/importing the process, delete the classifier value to create a broken reference on the process.
Scenario 4
Circumvention: Restart modeler and perform the delete action. Note, the import action may also fail, as described in the results, if the import includes the same process which was imported in step 1.
Alternate Scenario 4Perform Scenario 4 but do not export/import the project.
The information center for WebSphere Business Modeler Basic includes information on publishing projects. Publishing functions are not enabled in WebSphere Business Modeler Basic Version 6.0.
If you upgrade from WebSphere Business Modeler Basic to WebSphere Business Modeler Advanced, you should not use the same workspace, or projects will not behave as expected. Instead, if you want to use a project that you modeled in WebSphere Business Modeler Basic after upgrading to WebSphere Business Modeler Advanced, you should export the project from the Basic workspace and then import it into Advanced, or use versioning to access the project from the different workspaces.