(→HA Configuration)
|
(→HA Configuration)
|
Line 3: | |||
The following activities should be performed in the order presented. | The following activities should be performed in the order presented. | ||
- | 1. Provision the uDeploy Server Machines in preparation for the next step | + | 1. Provision the uDeploy Server Machines in preparation for the next step. |
2. Install and Configure Load-Balancer: The LB should forward to the machine provisioned in step 1. | 2. Install and Configure Load-Balancer: The LB should forward to the machine provisioned in step 1. |