Post Mortem: Silver Bullets
There was a strong desire in the development organizations for a silver bullet approach.
- Ideally the entire migration process would have been accomplished by running a single program.
- However, as much was automated as possible.
Analysis was done on automation.
- Was the time required to develop and test the automation greater than the time required to run the process “the hard way”?
- Was the process to be automated a general case or specific to one group?